All about the Philippines under the sun, which is new, hot, and different.

Saturday, September 29, 2012

G. Araneta Avenue Underpass

President Benigno S. Aquino III formally opened last Friday, Sept. 28 the C-3 or well known as G. Araneta Avenue — Quezon Avenue Interchange Project targeted at relieving the traffic bottle neck in the territory.
The road project requires the construction of a depressed underpass with a length of 440 lineal meters and 330 lineal meter's approaches along Quezon Avenue, including the depot of three submersible pumps with individual capacity of pumping out 277 liters per second backup by a power house with generating set and motor circuit switch to function depending on the intensity of the rain.



Photo by: Benhur Arcayan / Malacañang Photo Bureau



Formal Opening of the C-3 Road 
and Quezon Blvd. Interchange
~~~~~

~~~~~

Related Posts by categories



No comments:

Post a Comment